March 27, 2012
Fertilizer, Sewer Repairs, and other Spring Break Projects
spring break projects
Open gallery
<picture class="lw_image"> <source type="image/webp" media="(max-width: 500px)" srcset="/live/image/gid/255/width/500/27165_campus_safety_path_1-6-12.rev.1373935782.webp 1x"/> <source type="image/webp" media="(max-width: 800px)" srcset="/live/image/gid/255/width/800/27165_campus_safety_path_1-6-12.rev.1373935782.webp 1x"/> <source type="image/webp" media="(min-width: 801px)" srcset="/live/image/gid/255/width/1000/27165_campus_safety_path_1-6-12.rev.1373935782.webp 1x"/> <source type="image/jpeg" media="(max-width: 500px)" srcset="/live/image/gid/255/width/500/27165_campus_safety_path_1-6-12.rev.1373935782.jpg 1x"/> <source type="image/jpeg" media="(max-width: 800px)" srcset="/live/image/gid/255/width/800/27165_campus_safety_path_1-6-12.rev.1373935782.jpg 1x"/> <source type="image/jpeg" media="(min-width: 801px)" srcset="/live/image/gid/255/width/1000/27165_campus_safety_path_1-6-12.rev.1373935782.jpg 1x"/> <img src="/live/image/gid/255/width/1000/27165_campus_safety_path_1-6-12.rev.1373935782.jpg" width="960" height="1280" alt="" data-max-w="960" data-max-h="1280"/></picture>
We are fertilizing the entire campus with an organic product by Nature Safe starting Tuesday March 27 through Friday March 30. We are completing several other projects during Spring Break as outlined in the list below. If you have any questions or concerns, contact us at 503-768-7845.
- Campus Safety: ADA path, improvements to front entry
- Prep for summer work: Platt, Ponderosa, Evans
- Sewer Repairs: between JR Howard and Bodine lawn
- Fire alarm testing: Pamplin, Zehntbauer, Facilities, McAfee, Sequoia, Evans, Fields Art, JR Howard, Rogers
- Pamplin: install bollards
- East Hall: replace sidewalk
- Bodine: install bike racks
- Hoffman Art Gallery/Watzek: exterior lighting of Buck Statues
More The Source Stories
email source@lclark.edu