Fowler Student Center Renovation

Click here to find where an office is located during this construction project.

It’s an exciting time to be a part of the Lewis & Clark community! We are approaching the biggest renovation project we’ve experienced in more than 10 years.

Construction for the Templeton Student Center began December 16, 2021; Bremik Construction will bring to life the vision ZGF Architecture has carefully planned through hours and hours of interviews and meetings with Lewis & Clark leaders and students. Our new student center will welcome students with brighter and more open spaces, updated lighting, a pedestrian corridor, outside seating, courtyard improvements, and a new exterior elevator.

With any construction project of this magnitude, there will be some growing pains. Thank you in advance for your patience for our mess and noise and inconvenience.

Construction Updates

send-to-feature-switcher, Student Center Renovation

Going Up?

The new exterior elevator on the south side of the Fowler Student Center is up and running.

send-to-feature-switcher, Student Center Renovation

Fowler Student Center Soon to Be Beautiful Inside and Out

Fowler Student Center (formerly Templeton) is now beautiful on the inside, and it will soon be beautiful on the outside with a fresh coat of paint.

Capital Project, Capital Projects, send-to-feature-switcher, Student Center Renovation

Templeton Way is Back, Back Baby!

Yo, LC…let’s kick it…Back, back baby…Back, back baby. Alright stop, collaborate and listen. Templeton Way is back with a brand new addition!



Key Facts About Construction:

Dining

  • The only entrance to Fields Dining Room will be the northwest entrance (currently an emergency exit). There will be a temporary ramp installed at this entrance.
  • A restroom facility will be established at the northwest Fields dining hall entrance. This is the only restroom facility for the dining hall during construction.

Entry Points

All of the second floor except the Bookstore and Career Center will be under construction and inaccessible to the L&C community starting December 16 through the start of the 2022 fall semester.

Elevator

The current Templeton elevator will continue to operate during construction. There will be no access to the second floor, only first floor and third floor

Mailroom

The Mailroom has moved to the ground level of McAfee next to Human Resources-look for the oranges doors!

Parking

Parking is going to be one of the biggest challenges. The lower Templeton parking lot and the parking along the Stewart circle is going offline during construction to all except construction, college fleet, and service vehicles. Additional parking is available at the grad school gravel lot and St. Mark’s.

Vehicle Limitations

Templeton Way is closed.

Questions? 

At any time from December 2021 to January 2023, please feel free to reach out to Facilities Capital Project Coordinator Ryan Gardner  (rgardner@lclark.edu).

Contact:

Facilities Services 